Located in Kingman, AZ is a new distribution center for FedEx. This facility includes approximately 215,000 square feet of concrete. Get a sneak peek of the process in this video!!
Check out this great time lapse video using Helix Steel in our Airport Industrial Park project, located in Kingman, AZ.
Performed as General Contractor on this recently completed project near Kingman, Arizona for Scot Industries. The project encompassed all construction aspects of the 80,000 square foot building used for inventory distribution and manufacturing.
Outside dining area created with integral color concrete to match surrounding landscaping for the Hualapai Indian Tribe.
40,000 square feet of colored concrete individually poured with accompanying exposed aggregate for the circular shaped bus turnaround at the main ticketing facility.
Peach Springs General Store, owned by the Hualapai Indian Tribe, remodel included 643 square feet of flagstone shown above for front patio entrance.
Stamped concrete patio located at the clubhouse of Laughlin Ranch in Bullhead City, Arizona.
Close up view of stamped concrete for the Laughlin Ranch Clubhouse located in Bullhead City, Arizona.
50,000 square feet of concrete floor being poured for an assisted living facility since completed in Bullhead City, Arizona.
Completed for A.R. Mays Construction, Inc. all foundations, concrete slabs and site work for 56,000 square feet masonry building, as well as all exterior concrete and site work.
Completed for Great Basin Industrial; formed, placed and finished approximately 2,500 cubic yards of concrete for various building and equipment pads.
Completed for A.R. Mays Construction Inc. all foundations, concrete slabs and site work for a 50,000 square feet masonry building, as well as all exterior concrete and site work.
Completed for Wright Hospitality all foundations, concrete slabs and site work for a 96 room, 3 story motel. Site work included colored, stamped concrete patios and entry porta cochere.
Completed for Bob Carlson a 36,000 square foot warehouse building and associated site work, including placing foundations, retaining walls, scale truck docks and ramps and truck scale pit with approaches.
Performed as General Contractor and completed all concrete related work for elevated tank pedestals, foundations and equipment skid slabs for a new liquid natural gas plant.
Completed for Seabold Construction, Inc. all foundations, slabs and site work for two, three story 50,000 square foot living complexes in Bullhead City and Kingman, AZ.
Installed for Barker Morrissey 92,000 linear feet of Solar Panel foundations as well as hydraulic equipment pads using 11,500 cubic yards of concrete. Project was completed in less than three months pouring an average of 220 cubic yards of concrete per day.
Completed for T.R. Orr Construction a 10,000 square foot building slab with footings. Including all site work which consisted of 60,000 square feet of colored concrete sidewalks and 40,000 square foot bus turnaround.